What We Do

Services

The full list of deck work we take on, from new builds to repair calls.

Home › Services

Everything we take on

Every job below is one we do ourselves across Sun Prairie.

Deck Installation

We frame new decks with pressure-treated joists set 16 inches on center, sometimes 12 if you're running composite or planning a hot tub. Footings go below the frost line, which around Sun Prairie means 42 inches down. You pick the decking material, we handle the structural math underneath it.

Deck Repair

Soft spots, bouncy sections and loose railings usually mean rot or a failed connection somewhere in the frame, not just a cosmetic problem. We pull the deck boards to check the joists and ledger before deciding what actually needs replacing. Sometimes it's two boards, sometimes it's the whole ledger and flashing.

Deck Staining & Sealing

Wisconsin winters are hard on exposed wood, and a deck left bare grays out and starts to splinter within a couple of seasons. We pressure wash, let it dry fully, then stain with a product rated for UV and standing snow. Plan on resealing every two to three years depending on sun exposure.

Custom Deck Design

We sketch the layout around how you use the yard, stairs, built-in seating, a pergola, whatever makes sense for the lot. Multi-level designs need extra attention to beam sizing and post placement, and we work that out before any lumber gets ordered.

Composite Decking Installation

Composite boards don't rot or splinter, but they still sit on a framed substructure underneath, usually spaced tighter than for wood. We install hidden fastener systems so you don't see screw heads across the whole deck. It costs more upfront than pressure-treated pine, less in maintenance over ten years.

Deck Railing Installation & Repair

Railings have to meet a 36-inch height minimum for most residential decks and hold up to real lateral force, not just look good. We rebuild wobbly rail posts by bolting through the rim joist instead of screwing into the decking edge. Cable rail, wood baluster or composite, we size the posts to whatever load the style requires.

Multi-Level & Elevated Decks

Taller decks carry more wind load and need bigger footings and heavier beams than a ground-level platform. We size the structure for the actual height and span, not a generic plan pulled off a shelf. Stairs and landings get planned early, they're usually what trips up an elevated design.

Deck Demolition & Removal

Old decks come down board by board, nails and screws pulled or cut, lumber hauled off site. We check the ledger and the house band board once the old deck is off, since that's often where rot started in the first place.

Screened-In Porch & Deck Additions

A screened-in section keeps the bugs out without walling off the whole backyard, and we frame the roof structure to tie into your existing roofline correctly. We flash it the way we'd flash any roof-to-wall connection, because that's where leaks start if it's rushed.

Deck Inspections & Structural Repair

If you're buying a house with an existing deck or just worried about one you already have, we check the ledger attachment, footings, joist condition and railing connections. You get a straight answer on what's safe, what needs attention this year, and what can wait.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Sun Prairie, WI

Deck installation and repair across Sun Prairie and the towns around it.

Sun Prairie, WI
Madison, WI
Janesville, WI
Beloit, WI
Middleton, WI
Watertown, WI
Verona, WI
Waunakee, WI
Stoughton, WI
Baraboo, WI
Oregon, WI
DeForest, WI
Common Questions

Things worth asking

Questions that tend to come up once a deck project is underway.

Do I need a permit to build a deck?
Most municipalities in Dane County require a permit for decks over 30 inches above grade, and some require one regardless of height. A permit application typically includes a site plan and basic structural details, submitted before footings are dug.
How long does it take to build a deck?
A standard ground-level deck usually takes one to two weeks from footings to final boards, weather permitting. Multi-level decks, screened additions, or jobs needing engineered plans can run three to four weeks.
Can deck work be done within a set budget?
Decking material is usually the biggest lever on price, so switching from composite to pressure-treated pine or simplifying the railing design can bring a quote down. Stating a budget upfront lets the design fit it instead of redesigning after a quote comes back too high.
Do you guarantee your deck work?
Workmanship is backed for a set period after completion, with specifics included in the written quote. Material warranties, like those on composite decking, come separately from the manufacturer and get passed along to the homeowner.
Who handles communication during the project?
One point of contact handles scheduling and questions for the whole deck project, rather than different people for framing versus finish work. The same crew that sets the posts finishes the decking and railings.
What decking materials get used?
Pressure-treated pine, cedar, and composite boards from brands like Trex and TimberTech all get used regularly, each with different cost and maintenance tradeoffs. Pine costs least upfront but needs restaining every few years, while composite costs more but needs little beyond washing.
Can I still use my yard during a deck build?
Partial yard access is usually fine, but the immediate work area has to stay clear for safety and material staging. Saw and nail gun noise during work hours, plus a lumber delivery taking up driveway space for a day or two, are the main disruptions.
How should I prepare before deck work starts?
Clearing furniture, planters and grills off the existing deck or build area before the crew arrives speeds things up. Moving vehicles out of the driveway on delivery day helps too, since lumber usually comes on a flatbed that needs room to unload.
What happens if rot or damage turns up mid-project?
If a ledger board, rim joist or support post turns out to be rotted once old decking comes off, it gets flagged before replacement, along with a cost adjustment explained upfront. Hidden damage like this is common on older decks and is why framing gets checked before quoting repairs as purely cosmetic.
How should a finished deck be maintained?
Wood decks need cleaning and resealing roughly every two to three years, sooner if the deck gets full sun most of the day. Composite decking just needs an occasional wash with soap and water, no sealing required, but debris between boards should get swept out so it doesn't trap moisture.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (608) 975-5241